<img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=4234353&amp;fmt=gif">
MENU

New oral solid dosage (OSD) facility

A world-class continuous manufacturing OSD facility.

Concept design and front end study for a high-profile facility.

Designed for 15 billion tablets and 3 billion capsules per annum, the plant also has a warehouse with a capacity of ten thousand tablets.

 

This €250 million project included continuous dry and wet granulation, tablet coating and pressing, capsule generation, bottling and blister lines, purified water generation and distribution, clean-in-place systems, MV distribution and HVAC services, and automating all lines and material traceability.

 

Reach out to us for more information

Client

A pharmaceutical company

 

Location

China

 

Service

Conceptual design
Front end study
Process design
Mechanical piping design
Electrical & instrumentation design
HVAC & building services
Project management
Estimate & cost control
Master schedule
Automation management

 
Pernod Ricard